GOLDEN EYE BY ZECHNER & ZECHNER



Zechner & Zechner


The area in front of the station has been redesigned with a new projecting roof, called ‘Golden Eye’ by the locals, marking the centre of the plaza. The tram lines have seen the most modernisation, and now run underground, with all four lines directly connecting with the station.

Zechner & Zechner


Due to the Local Transport Hub offering international connection, the station will attract around 40,000 passengers. “The redesign of the station plaza and moving the tram lines underground allows us to offer passengers an attractive and functional local transport hub. This is a connection between East and West that is hugely important to the development of the city.”


Zechner & Zechner


Lisa Rücker, Graz deputy mayor and coordinator of roads and traffic planning, at the opening ceremony. The project has indeed had consequences for development all around the station site. Making the large plaza more attractive has proven to be just the first project for the area. The area’s improvement has reached a second stage with the redesign of Annenstraße, where construction work is ongoing.
Zechner & Zechner


The New Tram Stop at the Main Station

The new double-length stop for the tram lines 1, 3, 6 and 7 is situated underground below the green space at Europlatz. The stop is open to the sky above the lines, with covered waiting areas.


Zechner & Zechner


This allows natural light to illuminate the platforms and provides ventilation that, in the event of a fire,  is capable of clearing smoke from the station without need of additional systems. Passengers can also see the neighbouring hotel and the sky, which helps them to orientate themselves. Escalators and elevators provide disabled access at plaza level.


Zechner & Zechner


The wall and ceiling surfaces of the station are covered with a stripe pattern of fibre-reinforced concrete panels in three different grey tones. The angled and structured surface makes the station seem to have been ‘cut’ from the ground, with these cuts extending onto the surface of the plaza.


Zechner & Zechner


Redesign of the Station Plaza

The construction of the new below-ground stop offered the opportunity of adapting the heterogeneous look of the station plaza and the unsatisfactory layout of routes. The most significant element of the redesign is the covering of the plaza – an oval, ring-shaped disk that provides a ring of shelter to the station concourse and bus stops.


Zechner & Zechner


The ring roof, called ‘Golden Eye’ by the locals, creates an ‘outer concourse’ outside the existing station concourse. Viewed from below, the roof’s covering reflects a slightly distorted version of the stripes of the plaza pavement, passengers and vehicles, resembling a movie screen projection of their movements. The primary steel construction of the approx. 3,000 m2 projecting roof is made up of articulated circular-tube supports, the spine, which connects the individual supports, and radial ribs.


Zechner & Zechner


The total tonnage is approx. 420 tons. Prefabrication on site was used throughout construction. The limited space available at the construction site and short time window available for erecting the structure had also to be taken into consideration. The solution selected was bolting the entire structure together, without on-site welding.


Zechner & Zechner


Design of the Plaza

The station’s stripe pattern extends over the paving of the plaza area, and shades into differently designed green zones. The polygon beds of plants, designed by landscape architects 3zu0, and a rolling lawn topography not only makes relaxing in the station plaza much more visually attractive, but also provides various recreational uses. The improvement of bike lane access to the front of the station and creation of new covered bike storage was also part of the building project.


Zechner & Zechner
Zechner & Zechner







Zechner & Zechner
Zechner & Zechner 







Zechner & ZechnerZechner & Zechner 












Location: Graz, Austria 
Architect: Zechner & Zechner 
Project management:DI. Kai Uwe Preissl 
Transport planning:IKK ZTGmbH 
Construction:Steel: Zenkner & Handel 
Construction Concrete:Schimetta Consult 
Green space planning:3zu0 Landschaftsarchitektur 
Year: 2012 
Cost: € 90 million 
Client: Holding Graz Linien