COMMUNITY CENTRE BY MACHNÉ ARCHITEKTEN



01-Community-Centre-by-Machné-Architekten


The field and the stones

The new community centre consists of three main parts (auditorium, music rehearsal room, Town Hall) and the fire department.


02-Community-Centre-by-Machné-Architekten


The individual functions are as large ‘boulders’ scattered on the site. These species were aligned along important edges (neighbouring houses) and sightlines.


03-Community-Centre-by-Machné-Architekten


Those stones are connected by the foyer. The fire department serves as the basis of the ‘stones’. Through these separations of the building in the various areas the urban scale of the building fits very well into the existing structure.


04-Community-Centre-by-Machné-Architekten


The spaces between the ‘stones’ provide glimpses such as the view to the church.


05-Community-Centre-by-Machné-Architekten


The use of the site and the positioning of the town Hall on the street and the foyer to the north is creating two new squares.


06-Community-Centre-by-Machné-Architekten

The northern area of the building (foyer) goes over into the existing event space and in the south, a new place, which is flanked by the town hall and the fire department.


07-Community-Centre-by-Machné-Architekten


Internal Organization

By dividing the building into separate areas, it is possible to give each part its optimal form.


08-Community-Centre-by-Machné-Architekten


For example, both the auditorium and music rehearsal rooms are polygonal, for acoustic requirements. At the same time, the shaping of the building as ‘stones’ generates exciting architectural spaces.


11-Community-Centre-by-Machné-Architekten09-Community-Centre-by-Machné-Architekten10-Community-Centre-by-Machné-Architekten
 
14-Community-Centre-by-Machné-Architekten12-Community-Centre-by-Machné-Architekten13-Community-Centre-by-Machné-Architekten

17-Community-Centre-by-Machné-Architekten15-Community-Centre-by-Machné-Architekten16-Community-Centre-by-Machné-Architekten

Location: Abfaltersbach, Austria


Project Manager: Philipp Glanzl

Assistance: Michael Kapeller, Arch. Klaus Jahnel.

Structural Consultant: Tragwerksplanung Tagger Ziviltechniker

Area: 1.583,45 sqm.

Year: 2011

Photographs: Machné Architekten
Client:Gemeinde Abfaltersbach