.

Teardown Framing

They've framed the basement and first floor.



I blogged this one in early May when it was a hole.

2011-03-24-Morningsdie-Drive-Teardown-4
The original house R.I.P.

P1090022-2011-03-24-Morningside-Drive-Atlanta-Tear-Down
The hole.

P1110515-2011-06-05-Morningside-teardown-1st-floor-framing
Yestereday.

P1110518-2011-06-05-Morningside-teardown-1st-floor-framing-NW-Facade-Driveway-MAX
The new one has plenty of bumps, niches and overhangs. It's big and it's deep. This is the neighbor's driveway.

P1110519-2011-06-05-Morningside-teardown-1st-floor-framing-SE-Facade
There is going to be a pool! Back to the first picture:

P1110521-2011-06-05-Morningside-teardown-1st-floor-framing-SE-Facade-detail
See the where the foundation goes up all the way to the floor joists? I think the pool will be in that big niche.

We'll watch and let you know.